Public Works Engineering

Global Menu

Public Works Engineering

Assistant County Engineer | Engineering Division Manager
Thomas Weller, P.E.
 

Bow Hill Road Reconstruction

Concrete -Sauk Valley Road

Farm to Market Road / Josh Wilson Road Intersection Improvements

Francis Road Reconstruction: Section 1

Garden of Eden Rd/Willard Creek Culvert

2021 HMA Overlay Project

Josh Wilson Road: Phase 1

North Shore Drive Roadway Repair

Sinclair Dock Replacement

Sinclair Island Marine Access

Upper Finney Creek Bridge
(Seismic Retrofit)

Garden of Eden Road/Willard Creek Culvert Replacement Project
Project Number ES63440-3

Project Description
This project, located on Garden of Eden Road, will replace the Willard Creek culvert crossing with a fish passable structure. The existing system consists of two 36‐inch diameter corrugated metal pipe culverts that have failed due to corrosion and rust.  This has resulted in roadbed erosion that caused a sinkhole to form in the roadway.  This sinkhole has been patched by Skagit County Public works by placing a steel plate over the area.

After the replacement of the culvert is complete, this section of road will be repaved, and new guardrail sections will be installed adjacent to the new structure and roadway.


Project Schedule
Currently under design and securing necessary permits.
Construction, summer of 2022.

The Engineer’s estimated construction cost range is between $300K and $500K.

Funding Sources

  • Skagit County Road Fund

For more information, contact:
Sonny Andrew – Project Manager
(360)416-1400 / sonnya@co.skagit.wa.us

 


Contact Public Works Engineering

Assistant County Engineer | Engineering Division Manager
Thomas Weller, P.E.

1800 Continental Place
Mount Vernon, WA 98273
Phone: (360) 416-1400
Fax: (360) 416-1405

email: pw@co.skagit.wa.us