Public Works Engineering

Global Menu

Public Works Engineering

Assistant County Engineer | Engineering Division Manager
Thomas Weller, P.E.
 

Bow Hill Road Reconstruction

Concrete -Sauk Valley Road

Farm to Market Road / Josh Wilson Road Intersection Improvements

Francis Road Reconstruction: Section 1

Garden of Eden Rd/Willard Creek Culvert

2021 HMA Overlay Project

Josh Wilson Road: Phase 1

North Shore Drive Roadway Repair

Sinclair Dock Replacement

Sinclair Island Marine Access

Upper Finney Creek Bridge
(Seismic Retrofit)

Sinclair Dock Replacement Project


design

In 2012, Skagit County closed the Sinclair Dock (Bridge #40160) because its continued use for pedestrian or vehicular traffic created a danger to the traveling public. Skagit County is seeking to replace the dock with the Preliminary Engineering phase underway.

The following documents contain background on the Sinclair Dock:

design

SUBMIT YOUR COMMENTS

The County is currently working with a design consultant on advancing the level of design for a dock replacement.

The dock replacement concepts can be found HERE .

Please use the form below to submit any comments you have on the dock replacement design. Comments will be collected on an ongoing basis and shared with applicable staff and consultants.

Required submittal information includes your name and email address. Thank you.

Your Name : (Required)
Your Email*: (Required)
Comments:


Contact Public Works Engineering

Assistant County Engineer | Engineering Division Manager
Thomas Weller, P.E.

1800 Continental Place
Mount Vernon, WA 98273
Phone: (360) 416-1400
Fax: (360) 416-1405

email: pw@co.skagit.wa.us