| Bow Hill Road Reconstruction Concrete -Sauk Valley Road Farm to Market Road / Josh Wilson Road Intersection Improvements Francis Road Reconstruction: Section 1 Garden of Eden Rd/Willard Creek Culvert 2021 HMA Overlay Project Josh Wilson Road: Phase 1 North Shore Drive Roadway Repair Sinclair Dock Replacement Sinclair Island Marine Access Upper Finney Creek  Bridge (Seismic Retrofit)
 | 2021 Asphalt Overlay ProjectProject  Number ESHMA21-1
UPDATES September 20th:   Contractor  will begin work on September 20th on Old Hwy 99, south of Jolly  Road.  A single-lane closure will be in effect.  Work is anticipated  to continue in area throughout the week. Project  DescriptionThis  project will repair and pave  portions of Old Highway 99 North between Milepost 2.790 and Milepost 5.256.
 Portions of the existing roadway will be removed to a depth of approximately  2-inches and replaced with new asphalt pavement. Also, there are two areas  where the roadway that will require roadway excavation in order to  correct failing road subgrade.. At the conclusion of the road construction  work, newly painted lane lines will be installed and the roadway fully opened  to traffic.
 Constructing  signing, flaggers and traffic control will be in place during the project.  Traffic delays are to be expected. 
 Project  Schedule
 The construction  estimate for this project was $514,811.48
 Bids were  publicly opened on Monday, July 12, 2021 (2 contractors submitted bids  proposals)
 
 Lakeside  Industries, Inc. (Anacortes, WA) was the low bidder for the project at  $518,680.00 and will be the prime contractor for the project.
 
 Contractor will begin work on September 20, 2021 on Old Hwy 99, south of Jolly Road.  A single-lane closure will be in effect.  Work is anticipated to continue in area throughout the week.
 Funding  Sources 
            County  Road FundWashington  State County Arterial Preservation Program (CAPP)Bid  awarded to Lakeside for$518,680.00 on July 19, 2021. For more  information, contact:Sonny Andrew – Project Manager
 (360)416-1400 /  sonnya@co.skagit.wa.us
  
 | Contact Public Works Engineering Assistant  County Engineer | Engineering Division ManagerThomas  Weller, P.E.
 
 1800 Continental Place
 Mount Vernon, WA 98273
 Phone: (360) 416-1400
 Fax: (360) 416-1405
 